Pipeline work can require an isolated section or item of equipment to be drawn down before maintenance, repair, pigging or commissioning activity. Where the system, receiving route and project controls allow, cross-compression equipment can transfer gas, compatible liquid or mixed product from the isolated source to another suitable pipeline section, operating system or containment route.
This can reduce the quantity of product assigned to a planned venting pathway and retain recoverable product within an approved system. It does not guarantee complete recovery or eliminate every venting, flaring, safety or compliance requirement. Actual outcomes depend on the product, source and destination conditions, equipment configuration, connections, procedure and project controls.
Tremco Pipeline Equipment supplies access to ZEVAC equipment routes and current product information for project-specific review.
Where a recovery pathway may be considered
Subject to technical and operational review, cross-compression may be considered for selected:
- pipeline-section or spool drawdown before planned work;
- valve, fitting or component maintenance;
- launcher, receiver and trap activities;
- pigging and inline-inspection preparation;
- distribution, upstream or midstream pipeline work;
- commissioning or maintenance activities involving recoverable gas or compatible liquid; and
- applications where product can be transferred to a suitable receiving pipeline, system or containment route.
These are application categories, not a statement that one unit or setup is suitable for every task.
What is cross-compression?
ZEVAC describes its cross-compression equipment as using pneumatically powered positive-displacement linear compressors to move gas, compatible liquid or mixed product from an isolated pressurised section through approved connections to a suitable receiving system or containment route. Source and destination pressure conditions are application-specific.
A workable project therefore needs both sides of the transfer to be defined. The review must consider the gas or compatible liquid, source volume and conditions, destination or containment route, expected pressure profile, connection arrangement, available air supply, site constraints and approved operating procedure.
The equipment does not determine the isolation plan, receiving capacity, operating limits, regulatory obligations or safety controls. Those remain project-specific responsibilities.
Explore ZEVAC equipment routes
01
ZEVAC Mini
The ZEVAC Mini is part of the manufacturer’s cross-compression range. Confirm the intended fluid service against documentation for the exact Mini configuration.
Review the actual source and destination pressures, fluid, temperature, volume, required timing, air supply, connections, transport and site controls before selecting a configuration.
02
ZEVAC Twin
The ZEVAC Twin is another cross-compression product family. Review the exact generation and configuration, operating limits, performance data, air supply and ancillary equipment against the project requirements.
03
ZEVAC Quad
The ZEVAC Quad is another ZEVAC equipment route. Confirm supported fluid service, capacity and operating limits for the exact Quad configuration, together with the receiving route, logistics and site controls.
04
ZEVAC product range
Browse Tremco Pipeline Equipment’s ZEVAC product-family pages for product-specific information.
Information needed for technical review
Include:
- the work activity and reason the section must be drawn down;
- gas, liquid or mixed service and available composition information;
- source pipeline, vessel, trap or isolated-section volume;
- source operating and expected drawdown conditions;
- destination pipeline, system, storage or containment route;
- destination pressure, capacity and operating constraints;
- required timing or project objective;
- connection sizes and proposed connection arrangement;
- available compressed-air supply;
- temperatures and environmental conditions;
- site access, transport, footprint and noise constraints;
- hazardous-area and other project requirements;
- isolation, operations and regulatory requirements managed by the responsible parties;
- project location and required dates; and
- the intended supply requirement.
Tremco Pipeline Equipment can use these details to identify current product information and questions requiring manufacturer or technical review. The responsible project parties must approve the process, equipment configuration, connections, operating procedure, controls and measurement method.
Current supply pathway
Contact Tremco Pipeline Equipment to discuss the current supply pathway for the relevant ZEVAC family and configuration.
Product information
Questions about methane venting reduction equipment
What must be reviewed for cross-compression?
Can cross-compression eliminate all venting?
Can ZEVAC equipment handle liquids as well as gas?
Does using this equipment establish Australian regulatory compliance?
How should recovered product or avoided venting be measured?
Discuss a gas or liquid recovery application
Send the service, work activity, source and receiving conditions, connection and air-supply information, location, timing and intended supply requirement.
Discuss a gas or liquid recovery application
For hire enquiries about the ZEVAC TWIN Gen IV gas recompression unit (ASME Class 600 rated) and ZEVAC Mini-LP gas recompression unit, view our confirmed equipment hire offering. Contact us to confirm current availability
For current product information, view the ZEVAC equipment range or contact Tremco Pipeline Equipment with the project information outlined above.